Sea sand on the Galle-Colombo main road with strong sea waves in recent years Due to the arrival, there was a severe road blockade and by 2020 this situation will be very severe. As has happened from time to time for several months, and in part here the existing revetment is completely Increases the height of the revetment of the remaining sections and below (Tor part) Height work should be done. These areas are about 2 km in length.